SPILLWAY CREST REHABILITATION AND STRUCTURAL STRENGTHENING

Reconstruction and structural strengthening of the spillway crest and construction of a reinforced-concrete energy-dissipation structure.
PROJECt DETAILS
Category:

Structural Rehabilitation, Hydraulic Engineering

Location:

Taiguaiguai Reservoir
Lamas Municipality
Aragua State

Design Engineer:

Structural Pathology Eng. 
Germán Lozano.

Scope of Work:
Reconstruction and structural strengthening of the spillway crest and construction of a reinforced-concrete energy-dissipation structure.

Technical Specifications:

  • Spillway crest:
    Length: 100 m; base width: 3.80 m; upstream/downstream face height: 3 m; crest width: 0.30 m.
  • Energy-dissipation structure:
    Front wall and wing walls: 16 m long, 2.70 m high and 0.30 m thick.
  • Base slab:
    Area: 59 m²; thickness: 0.30 m.
LOCATION

Taiguaiguai Reservoir, Lamas Municipality,
Aragua State.

Type of work

Structural Rehabilitation,
Hydraulic Engineering

Specifications
  • Spillway crest.
  • Energy-dissipation structure.