Scope of Work: Construction of a retaining wall and structural strengthening of the reinforced-concrete dike using foundations and isolated piles arranged as a dolphin-type structural system.
Technical Specifications:
- Raising of the reinforced-concrete dike front walls.
- Construction of two tie foundations for the isolated-pile dolphin system, connected to horizontal and vertical reinforced-concrete diaphragms forming part of the structural-strengthening load-transfer system.
LOCATION
La Punta Sector, Los Tacarigua Lake, Aragua State.
Type of work
Structural Strengthening, Hydraulic Engineering
Specifications
- Raising of the reinforced-concrete dike front walls.
- Construction of two tie foundations for the isolated-pile dolphin system, connected to horizontal and vertical reinforced-concrete diaphragms forming part of the structural-strengthening load-transfer system.















