Scope of Work: Construction of a reinforced-concrete spillway channel for flood control at the Zuata Reservoir, including a stepped chute for hydraulic energy dissipation prior to discharge into the Aragua River.
Technical Specifications:
- Construction of a reinforced-concrete open spillway channel.
Width: 15.50 m.
Length: 200 m.
Sidewall height: 1 m. - Construction of the support bridge for the elevated channel section.
Width: 12 m.
Length: 10 m.
Sidewall height: 1 m.
Elevation height: 2.20 m. - Construction of a stepped chute for flow conveyance and hydraulic energy dissipation.
Width: 12 m.
Length: 7.20 m.
Sidewall height: 1 m.
Elevation height: 7.20 m.
Step tread: 1.20 m.
Step riser: 1.20 m.
LOCATION
Zuata Park, Zuata Parish, José Feliz Rivas Municipality, Aragua State.
Type of work
Hydraulic Engineering
Specifications
- Construction of a reinforced-concrete open spillway channel.
- Construction of the support bridge for the elevated channel section.
- Construction of a stepped chute for flow conveyance and hydraulic energy dissipation.
DO YOU HAVE A
WE CAN HELP WITH?















