Scope of Work: Construction of reinforced-concrete sidewalls to upgrade the spillway channel, placement of riprap protection, and raising of the channel stilling basin for discharge into the Pao River.
Technical Specifications:
- Spillway channel.
Sidewalls 80 m long and 2.20 m high.
- Riprap protection.
Rock armoring 105 m long and 7 m high.
- Stilling basin.
Sidewalls 20 m long and 0.80 m high.
LOCATION
Pao-La Balsa Reservoir, Pao de San Juan Bautista Municipality, Cojedes State.
Type of work
Hydraulic Engineering
Specifications
- Spillway channel.
Sidewalls 80 m long and 2.20 m high.
- Riprap protection.
Rock armoring 105 m long and 7 m high.
- Stilling basin.
Sidewalls 20 m long and 0.80 m high.